COIIAS Accelerate SME Office

Workshop

In person (Oviedo)

Workflow from point cloud to BIM model. Practical case

Breaking barriers between the real and the digital

20/12/2023

Start Time: 09:30 h.

End time: 12:00 p.m.

(Free and open access. Limited places)
OAP Framework 169

Aim

The main objective of the day is to demonstrate, in a practical way, the passage from reality to the digital model. To do this, the complete process will be carried out, from obtaining point cloud with professional equipment, to its processing into a digital model. As a transversal objective, the main keys to carrying out a BIM project.

On this day The aim is to make known and eliminate barriers in the adoption of digital solutions to engineering and construction processes.  Aimed at SMEs and self-employed professionals related to the field of engineering and construction.

(Eminently practical approach throughout the course of the day. Doubts or questions may be raised) 

Diary

09:30 a.m.- Presentation of the day and speakers

09:35 h.- Problems and barriers in the adoption of digital solutions in the construction field 

09:45 h.- Real-time room scanning 

10:45 a.m.- Measurement, layout and monitoring processes 

11:00 a.m.- Digital model practical case. Integration and digital model 

12:00 p.m. Networking coffee

Location

In person, in the offices of the COIIAS – Training room C/Asturias 9, 1ºE 30004 Oviedo (Asturias)

Lousy here to go

Speakers

JUAN JOSÉ GONZÁLEZ MORENO

Industrial Engineer. DEA (project management area)

Currently, he manages technological innovation projects and management of engineering and construction projects.

He has developed his professional career in the field of engineering and construction, also working as a teacher.

He has extensive experience in digitizing processes in the field of engineering and project management.

RAÚL GARCÍA CANTON

Technical Engineer in Topography 

Co-founder of TdT Topography Study, Neotop, Topography and 3D Systems.

Currently, he is responsible for technical support at Topcon Spain.

Participated in the execution of infrastructure construction projects: roads, bridges, buildings, tunnels and industrial plants. 3D automation of industrial processes with public works machinery.

EFRÉN ROZA CASCALLANA

Technical architect 

Currently, he is Site Project Manager and Construction Manager (Works with BIM methodology).

Participó en obras de edificación de diversa índole, tanto en el campo de la gerencia de empresa como en la gestión y desarrollo de proyectos y seguimiento «in situ» de procesos de ejecución.

Absolute defender of collaborative work and active and effective interaction between professionals in the AEC sector, for years he has been immersed in the knowledge and practical application of the BIM Methodology.

LUIS ANTONIO FERNÁNDEZ FERNÁNDEZ

Technical architect

He is currently Director of VBE6D (Cantabria).

Linked to construction, from the construction site to project management, in Galicia, Portugal, Asturias, Castilla y León and Cantabria and, in the last 10 years, also in the rest of Europe, the Middle East, Africa and America.

From the innovation and development of industrialized construction solutions and the management of its manufacturing facilities, it reached the digitalization of assets and projects of any nature through the use of the BIM methodology.